河内五分彩后三组六

河内五分彩后三组六

About us

河内五分彩后三组六

Cairn has production from two major UK North Sea assets, Catcher and Kraken, which Cairn progressed through the development stage to achieve first oil in 2017. Cairn holds a 20% non-operated interest in the Catcher development and a 29.5% non-operated interest in the Kraken development.

Net production to Cairn from the Catcher and Kraken fields in H1 2019 averaged ~23,700* boepd. Full year 2019 net production is estimated to be 21,000-23,000 bopd*.

Gross production from the Catcher Area (Cairn 20% WI) (comprising the Catcher, Varadero and Burgman fields) averaged ~66,600 bopd in H1 2019. Gross production from Kraken (Cairn 29.5% WI) averaged ~32,700 bopd in H1 2019.

*Before FlowStream’s production entitlement which is expected to be 1,350 to 1,575 bopd in 2019

IMG_5884.jpg
Back to About us
腾讯分分彩波动软件时时分分彩官方网站下载
baiduxml